MANILA, Philippines — The Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding along EDSA, with the proposed design released on Wednesday.
The plan calls for detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system leading to Makiling Creek.
According to the proposal, the project will be implemented in three phases covering 182 hectares: a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
MMDA unveils plan to build rainwater impounding facilities in Camp Aguinaldo

For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm/hr over 24 hours) and exceeding the needed 36,945 cubic meters., This news data comes from:http://yx-irvh-yc-xy.yamato-syokunin.com
MMDA’s schematic shows that under normal weather, water bypasses the pond and traverses the lagoon to EDSA; during heavy rains, floodgates divert flows into the pond; after rains, pumps discharge stored water slowly to EDSA toward Makiling Creek.
The scope of work covers the impounding area, an operations and power house, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements and a memorandum of agreement were being discussed..
- House bill seeks to regulate AI use
- Marcos names Dizon as DPWH secretary
- Filipino member of AHOF K-pop group says Manila concert a dream come true
- ‘New NBI chief must be career official’
- Palace rejects Sara's offer of 'free advice' on flood solutions, says to give it to 'Mayor Baste' instead
- Cyclone's trough, habagat will bring cloudy skies, rain showers over PH
- Lacson replaces Marcoleta as Blue Ribbon panel chairman
- Marcos to create independent commission to investigate flood control anomalies
- Pagasa sees two to four tropical cyclones hitting Philippines in September
- Marcos lauds Alex Eala’s win in Guadalajara